1,318
edits
Welcome to Sprocket School! This project is maintained by volunteer editors. Learn more about how this works. |
No edit summary |
No edit summary |
||
Line 18: | Line 18: | ||
'''During projection''': | '''During projection''': | ||
* If possible, use 2000 ft. reels and a dual-projector [[changeover]] system. NEVER use [[platters]] or build [[archival prints]] onto reels larger than 2000ft. | * If possible, use 2000 ft. reels and a dual-projector [[changeover]] system. NEVER use [[Platter systems|platters]] or build [[archival prints]] onto reels larger than 2000ft. | ||
* If using a [[platter system]] to screen non-archival prints, routine maintenance and calibration of system is a must. | * If using a [[platter system]] to screen non-archival prints, routine maintenance and calibration of system is a must. | ||
* If you're running small gauge film, do not have a changeover system, and have received permission from the archive to build onto larger reels, do not remove the heads and tails when you build the print. You'll have to close the dowser during the show as the heads and tails run through. | * If you're running small gauge film, do not have a changeover system, and have received permission from the archive to build onto larger reels, do not remove the heads and tails when you build the print. You'll have to close the dowser during the show as the heads and tails run through. | ||
Line 50: | Line 50: | ||
==See Also== | ==See Also== | ||
[[Archival print]] | *[[Archival print]] | ||
[[Film damage]] | *[[Film damage]] | ||
[[Inspection]] | *[[Inspection]] | ||
*[[Shipping]] | |||
==External References== | ==External References== |